PAVING CREW 1:     HELIO,  NOE,  FRANCISCO,  MIKE D,  KYLER, RONNIE,  MIKE L., KEVIN,  JORGE 

6:30am on-site:      

job 1:    150 Amherst Alley, Cambridge  (estimator BR)  PO#:  3937

—     fine grade of 2,700 SF (1 1/2″ binder, 1″ top)

job 2:  58 Washington St., Natick   (estimator MB)    PO#:  1860

—   install binder to excavated areas, 1693 SF.  (BINDER HAS TO BE USED…!!!)          Install top to entire driveway, 2463 SF

job 3:   48 Edgewood Rd., Wayland  (estimator CG)    PO#:  3243

—  install top to 1,120 SF

 

 

 

 

_______________________________________________________________

DIG/GRADING CREW:   BRIAN,  ANTHONY, CARLOS,  (bobcat)  — DI (w/torch)  (NOTE:  concrete block and guardrail are staying!!)

6:30am on-site:    —–   

 

job 1:    155 Market St., Everett  (estimator CG)    PO#:  3761

—  exc 2,560 SF.  Cut out train tracks and haul away.

_________________________________________________________________________________________________________________________________

PAVING CREW 2:   NICK,  TONY,  CHRISTIAN,  MARCELLO , JOSE

6:30am on-site:         

job 1:    100 Broadway (Rt. 99), Everett  (estimator BR)    PO#:  3407

—   pave potholes and square off—-top only to 1000 SF

 

job 2:    175-191 West Wyoming Ave., Melrose  (estimator BD)    PO#:  1399

—   reclaim 29,135 SF.     Raise/reset catch basins.

DUMPSITE:  Newport, Westford

___________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________

MILL CREW 2:  JORDAN,  ARTHUR,  JEFF,  HELTON

6:30am on-site:

job 1:    525 Highland Ave., Malden  (estimator JB)    PO#:  1397

—    reclaim 12,231 SF.    Raise catch basin.

job 2:    call office

DUMPSITE:  Newport, Westford

 _____________________________________________________________________________________________________________________

MILLING CREW:   HOWIE,  BILLY    (need catch basin cover, silt sacks,  catch basin cover)

7am on-site:    

job 1:   20 Mountain Ave., Bloomfield, CT  (estimator CT)  

—    mill 34,266 SF.   Install new catch basin cover.    Silt sacks.   Repairs at island curbs…

DUMPSITE:   Garrity’s, Bloomfield, CT    (Howie’s workplace—-see him for details)…  

TRUCKS:    Alex (RSL)  860-982-6932  (5 trucks, first two at 7am, next two at 7:30am, final one at 8am…) 

WATER TRUCK:   Hine Pool Water  (Kevin:  203-795-4545) 

_________________________________________________________________________________________________________________________________________

 

SEALCOAT CREW:   JOEL,  LOUIS, MARK, FABRIZIO, VERNON

Vernon, Mark, Joel, Louis and   Fabrizio

7am onsite:  Londonderry NH:  4 Orchard Drive

Total : Crack fill 9,442,  lf : Green area: sealcoat  275,700. Square feet  Yellow Area: 120,193 includes sides and back of building

Tanker is on site:

 

 

 

     

 

    _________________________________________________________________________________________________________________________

ATTENTION ALL TRUCK DRIVERS:

THERE WAS AN INCIDENT RECENTLY WHERE ONE OF OUR TRUCK DRIVERS LEFT THEIR BED UP, KNOCKING DOWN WIRES ON A JOB.   LUCKILY NOBODY WAS HURT.  YOU ARE 100-PERCENT RESPONSIBLE FOR YOUR OWN TRUCKS, MAKING CERTAIN THAT THE BEDS ARE DOWN AND THAT YOU’RE AWARE OF YOUR SURROUNDINGS.  PLEASE CHECK YOUR TRUCK BED BEFORE MOVING!!

FOREMEN:    PLEASE REMIND YOUR DRIVERS TO MAKE SURE THEIR BODIES ARE DOWN, THAT THEY’RE PAYING ATTENTION ON THE JOB, MAKING SURE THEY’RE WATCHING THEIR SURROUNDINGS AND THE LABORERS.        

——————————————————————————————————————————————————————————————————————————————————————————

NOTE:     ALL DRIVERS LEAVING FROM THE YARD TO LOAD AT BENEVENTO’S OR KEATING SHOULD ALWAYS TAKE A LOAD OF BROKEN ASPHALT TO DUMP AT THE PLANTS.  

——————————————————————————————————–

ALL TRUCKS—–REMEMBER TO TAKE BROKEN ASPHALT FROM YARD, DUMP AT PLANTS WHEN PICKING UP MIX…..!!!!!   

—————————————————————————————————

—————————————————————————————————————————————-                                                               

xxxxx – TRUCK xx

job 1:   

___________________________________________________________________________________________________________________________________

ROB REARDON – TRUCK 33  (low bed) 

job 1:    4am:   Get CAT exc from 58 Washington St., Natick, bring to 155 Market St., Everett.   THEN, take gravel roller from yard, take to 525 Highland Ave., Malden

_______________________________________________________________________________________________________________________________

CHRIS HONOR – TRUCK 34    

job 1:    5:15am at Benevento’s, pick up load of top, take to 150 Amherst Alley, Cambridge

___________________________________________________________________________________________________________________________________

RUSSELL ROBERTS – TRUCK 37   

job 1:     7am on-site:  go empty to 155 Market St., Everett

 ______________________________________________________________________________________________________________________________

KHRIS MARKS –  TRUCK 38   (trailer w/ bobcat)

job 1:    6:30am on-site:  go empty to 525 Highland Ave., Malden

_________________________________________________________________________________________________________________________________

MARIO –  TRUCK 32   

job 1:    5:30am at Benevento’s, pick up load of top, take to 150 Amherst Alley, Cambridge

____________________________________________________________________________________________

ROB PINTO –  TRUCK 30

job 1:    7:30am on-site:  go empty to 525 Highland Ave., Malden

________________________________________________________________________________________________________________________

LOGAN –  TRUCK 36 

job 1:    5:15am at Benevento’s, pick up 15-tons of top, take to 100 Broadway (Rt. 99), Everett 

_________________________________________________________________________________________________________________________________

RENTAL TRUCKS:

First Class Rental  (Russ:  617-839-3696)  

6:30am in yard, take load to Newport, then go empty to 525 Highland Ave., Malden  

 

Adam Trucking   (Christian:  508-385-9273)

6:30am in yard, take load to Newport, then go empty to 155 Market St., Everett 

                                                                        

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

____________________________________________________________________________________________________________________

SUBCONTRACTORS

SUB 1:    J & J, Somerville

– 

SUB 2:    Heyland, Quincy

SUB 3:    none

___________________________________________________________________________________________________________________________________

RITACCO BROS DAILY JOBS – PINOT 508-962-5618

EXCAVATION CREW: 

7am on site: Police detail on site 7am

Burlington :  61 Wilmington  Rd  ( Bill Dunn ) PO#  2567

excavate existing asphalt and front walkway, widen driveway and base of driveway to 20’. Install new back walk. total 1,206 square feet

 

Job 2: Arlington: 136 Lowell St  ( Ron P ) PO# 3508

excavate asphalt and concrete approx.  440 square feet

 

 

 

 

 

 

PAVING CREW: 

7am on site:

Stoneham:  64-65 Main  St  (  Bill Dunn)  PO# 3924

excavate and pave asphalt approx. 75 square feet, and pave around catch basin

 

Job 2:  Boston: Behind Building 417 Beacon St in Alley  ( Chris G ) PO# 3455

saw cut asphalt and pave around the lifted area approx. 36 sq ft

 

Job 3; Burlington : 61 Wilmington Rd  ( Bill Dunn) ( PO 2567 )

install binder and top to 1,206 square feet

 

 

 

 

 

 

 

 

 

 

  

  

PLEASE MAKE SURE ALL JOBS ARE MEASURED BEFORE YOU START TO DIG.

IF THERE IS ANY DIFFERENCE YOU NEED TO CALL THE ESTIMATOR BEFORE YOU DIG !!!