
- This event has passed.
10-31-2017
October 31, 2017
PAVING CREW 1: HELIO, NOE, FRANCISCO, MIKE D, KYLER, RONNIE, MIKE L., KEVIN, JORGE
6:30am on-site:
job 1: 150 Amherst Alley, Cambridge (estimator BR) PO#: 3937
— fine grade of 2,700 SF (1 1/2″ binder, 1″ top)
job 2: 58 Washington St., Natick (estimator MB) PO#: 1860
— install binder to excavated areas, 1693 SF. (BINDER HAS TO BE USED…!!!) Install top to entire driveway, 2463 SF
job 3: 48 Edgewood Rd., Wayland (estimator CG) PO#: 3243
— install top to 1,120 SF
_______________________________________________________________
DIG/GRADING CREW: BRIAN, ANTHONY, CARLOS, (bobcat) — DI (w/torch) (NOTE: concrete block and guardrail are staying!!)
6:30am on-site: —–
job 1: 155 Market St., Everett (estimator CG) PO#: 3761
— exc 2,560 SF. Cut out train tracks and haul away.
_________________________________________________________________________________________________________________________________
PAVING CREW 2: NICK, TONY, CHRISTIAN, MARCELLO , JOSE
6:30am on-site:
job 1: 100 Broadway (Rt. 99), Everett (estimator BR) PO#: 3407
— pave potholes and square off—-top only to 1000 SF
job 2: 175-191 West Wyoming Ave., Melrose (estimator BD) PO#: 1399
— reclaim 29,135 SF. Raise/reset catch basins.
DUMPSITE: Newport, Westford
___________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________
MILL CREW 2: JORDAN, ARTHUR, JEFF, HELTON
6:30am on-site:
job 1: 525 Highland Ave., Malden (estimator JB) PO#: 1397
— reclaim 12,231 SF. Raise catch basin.
job 2: call office
DUMPSITE: Newport, Westford
_____________________________________________________________________________________________________________________
MILLING CREW: HOWIE, BILLY (need catch basin cover, silt sacks, catch basin cover)
7am on-site:
job 1: 20 Mountain Ave., Bloomfield, CT (estimator CT)
— mill 34,266 SF. Install new catch basin cover. Silt sacks. Repairs at island curbs…
DUMPSITE: Garrity’s, Bloomfield, CT (Howie’s workplace—-see him for details)…
TRUCKS: Alex (RSL) 860-982-6932 (5 trucks, first two at 7am, next two at 7:30am, final one at 8am…)
WATER TRUCK: Hine Pool Water (Kevin: 203-795-4545)
_________________________________________________________________________________________________________________________________________
SEALCOAT CREW: JOEL, LOUIS, MARK, FABRIZIO, VERNON
Vernon, Mark, Joel, Louis and Fabrizio
7am onsite: Londonderry NH: 4 Orchard Drive
Total : Crack fill 9,442, lf : Green area: sealcoat 275,700. Square feet Yellow Area: 120,193 includes sides and back of building
Tanker is on site:
_________________________________________________________________________________________________________________________
ATTENTION ALL TRUCK DRIVERS:
THERE WAS AN INCIDENT RECENTLY WHERE ONE OF OUR TRUCK DRIVERS LEFT THEIR BED UP, KNOCKING DOWN WIRES ON A JOB. LUCKILY NOBODY WAS HURT. YOU ARE 100-PERCENT RESPONSIBLE FOR YOUR OWN TRUCKS, MAKING CERTAIN THAT THE BEDS ARE DOWN AND THAT YOU’RE AWARE OF YOUR SURROUNDINGS. PLEASE CHECK YOUR TRUCK BED BEFORE MOVING!!
FOREMEN: PLEASE REMIND YOUR DRIVERS TO MAKE SURE THEIR BODIES ARE DOWN, THAT THEY’RE PAYING ATTENTION ON THE JOB, MAKING SURE THEY’RE WATCHING THEIR SURROUNDINGS AND THE LABORERS.
——————————————————————————————————————————————————————————————————————————————————————————
NOTE: ALL DRIVERS LEAVING FROM THE YARD TO LOAD AT BENEVENTO’S OR KEATING SHOULD ALWAYS TAKE A LOAD OF BROKEN ASPHALT TO DUMP AT THE PLANTS.
——————————————————————————————————–
ALL TRUCKS—–REMEMBER TO TAKE BROKEN ASPHALT FROM YARD, DUMP AT PLANTS WHEN PICKING UP MIX…..!!!!!
—————————————————————————————————
—————————————————————————————————————————————-
xxxxx – TRUCK xx
job 1:
___________________________________________________________________________________________________________________________________
ROB REARDON – TRUCK 33 (low bed)
job 1: 4am: Get CAT exc from 58 Washington St., Natick, bring to 155 Market St., Everett. THEN, take gravel roller from yard, take to 525 Highland Ave., Malden
_______________________________________________________________________________________________________________________________
CHRIS HONOR – TRUCK 34
job 1: 5:15am at Benevento’s, pick up load of top, take to 150 Amherst Alley, Cambridge
___________________________________________________________________________________________________________________________________
RUSSELL ROBERTS – TRUCK 37
job 1: 7am on-site: go empty to 155 Market St., Everett
______________________________________________________________________________________________________________________________
KHRIS MARKS – TRUCK 38 (trailer w/ bobcat)
job 1: 6:30am on-site: go empty to 525 Highland Ave., Malden
_________________________________________________________________________________________________________________________________
MARIO – TRUCK 32
job 1: 5:30am at Benevento’s, pick up load of top, take to 150 Amherst Alley, Cambridge
____________________________________________________________________________________________
ROB PINTO – TRUCK 30
job 1: 7:30am on-site: go empty to 525 Highland Ave., Malden
________________________________________________________________________________________________________________________
LOGAN – TRUCK 36
job 1: 5:15am at Benevento’s, pick up 15-tons of top, take to 100 Broadway (Rt. 99), Everett
_________________________________________________________________________________________________________________________________
RENTAL TRUCKS:
First Class Rental (Russ: 617-839-3696)
6:30am in yard, take load to Newport, then go empty to 525 Highland Ave., Malden
Adam Trucking (Christian: 508-385-9273)
6:30am in yard, take load to Newport, then go empty to 155 Market St., Everett
____________________________________________________________________________________________________________________
SUBCONTRACTORS
SUB 1: J & J, Somerville
–
SUB 2: Heyland, Quincy
–
SUB 3: none
–
___________________________________________________________________________________________________________________________________
RITACCO BROS DAILY JOBS – PINOT 508-962-5618
EXCAVATION CREW:
7am on site: Police detail on site 7am
Burlington : 61 Wilmington Rd ( Bill Dunn ) PO# 2567
excavate existing asphalt and front walkway, widen driveway and base of driveway to 20’. Install new back walk. total 1,206 square feet
Job 2: Arlington: 136 Lowell St ( Ron P ) PO# 3508
excavate asphalt and concrete approx. 440 square feet
PAVING CREW:
7am on site:
Stoneham: 64-65 Main St ( Bill Dunn) PO# 3924
excavate and pave asphalt approx. 75 square feet, and pave around catch basin
Job 2: Boston: Behind Building 417 Beacon St in Alley ( Chris G ) PO# 3455
saw cut asphalt and pave around the lifted area approx. 36 sq ft
Job 3; Burlington : 61 Wilmington Rd ( Bill Dunn) ( PO 2567 )
install binder and top to 1,206 square feet
PLEASE MAKE SURE ALL JOBS ARE MEASURED BEFORE YOU START TO DIG.
IF THERE IS ANY DIFFERENCE YOU NEED TO CALL THE ESTIMATOR BEFORE YOU DIG !!!
___________________________________________________________________________________________________________________________________