
- This event has passed.
11/18/2017
November 18, 2017
PAVING CREW 1: HELIO, NOE, FRANCISCO, MIKE D, KYLER, RONNIE, MIKE L., KEVIN, EDUARDO, JORGE / VERNON WITH TRIMMER
6:30 am on-site:
Job 1.: 101 Gerard St Roxbury
840 Sq Ft Overlay
Job 2 : 550 King St Littleton
Install # Speed Bumps as shown on specs provided CG
WHEN MIKE L AND VERNON ARE DONE CUTTING KEY WAYS SEND THEM TO JOHNNY B’S HOUSE
_______________________________________________________________
DIG/GRADING CREW: BRIAN, ANTHONY, CARLOS,
OFF
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
PAVING CREW 2: TONY , CHRISTIAN, MARCELLO , JOSE, RICARDO, NICK, HELTON
7:30am on-site:
job 1 : 39 West St Northboro
Install 260 LF Cobblestones to Finish Driveway JB
________________________________________________________________________________________________________________________________________
MILL CREW : JORDAN, ARTHUR, JEFF , BILLY
OFF
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________
SEALCOAT CREW: JOEL, LOUIS, MARK, FABRIZIO
OFF
_________________________________________________________________________________________________________________________
ATTENTION ALL TRUCK DRIVERS:
THERE WAS AN INCIDENT RECENTLY WHERE ONE OF OUR TRUCK DRIVERS LEFT THEIR BED UP, KNOCKING DOWN WIRES ON A JOB. LUCKILY NOBODY WAS HURT. YOU ARE 100-PERCENT RESPONSIBLE FOR YOUR OWN TRUCKS, MAKING CERTAIN THAT THE BEDS ARE DOWN AND THAT YOU’RE AWARE OF YOUR SURROUNDINGS. PLEASE CHECK YOUR TRUCK BED BEFORE MOVING!!
FOREMEN: PLEASE REMIND YOUR DRIVERS TO MAKE SURE THEIR BODIES ARE DOWN, THAT THEY’RE PAYING ATTENTION ON THE JOB, MAKING SURE THEY’RE WATCHING THEIR SURROUNDINGS AND THE LABORERS.
——————————————————————————————————————————————————————————————————————————————————————————
NOTE: ALL DRIVERS LEAVING FROM THE YARD TO LOAD AT BENEVENTO’S OR KEATING SHOULD ALWAYS TAKE A LOAD OF BROKEN ASPHALT TO DUMP AT THE PLANTS.
——————————————————————————————————–
ALL TRUCKS—–REMEMBER TO TAKE BROKEN ASPHALT FROM YARD, DUMP AT PLANTS WHEN PICKING UP MIX…..!!!!!
—————————————————————————————————
—————————————————————————————————————————–
xxxxx – TRUCK xx
job 1:
___________________________________________________________________________________________________________________________________
ROB REARDON – TRUCK 33 (Dump Trailer) —
job 1: 8:00 Am MR Wood Recycling 29 Scobie Pond Rd Derry NH Pick Up a load of Loam and Bring to Bill Lussier House and Load Stumps And Dump at Same Place.
_______________________________________________________________________________________________________________________________
CHRIS HONOR – TRUCK 34
job 1: 6:00 at Beneventos Picking up 20 Ton of Top Going to 101 Gerard St Roxbury Ma
___________________________________________________________________________________________________________________________________
RUSSELL ROBERTS – TRUCK 37
job 1: OFF
______________________________________________________________________________________________________________________________
KHRIS MARKS – TRUCK 38
job 1: OFF
_________________________________________________________________________________________________________________________________
MARIO – TRUCK 32
job 1: OFF
____________________________________________________________________________________________
ROB PINTO – TRUCK 30 6 Wheeler
8:30 Am Empty on Site at Johhny B House 10 Penobscot Way Andover
________________________________________________________________________________________________________________________
LOGAN – TRUCK xx
job 1: OFF
_________________________________________________________________________________________________________________________________
RENTAL TRUCKS:
____________________________________________________________________________________________________________________
SUBCONTRACTORS
SUB 1:
–
SUB 2:
–
SUB 3:
–
___________________________________________________________________________________________________________________________________
RITACCO BROS DAILY JOBS – PINOT 508-962-5618
EXCAVATION CREW:
PAVING CREW:
7am on-site: Saturday
Melrose: 9 Orient Ave. (Bill Dunn) PO # 3970
–Install 952 sq ft of binder and top, resurface asphalt areound deck and behind house, approx. 520 sf
Haverhill: 45 Worcester St., (Mike B) PO# 3713
–pave existing driveway approx 1,480 SF
Job 2: North Andover: 23 Beech Ave (Bill Dunn) PO# 3927
–pave approx 440 SF
job 3: North Andover: 396 Andover St (Bill Dunn) PO# 3872
–pave 360 SF
PLEASE MAKE SURE ALL JOBS ARE MEASURED BEFORE YOU START TO DIG.
IF THERE IS ANY DIFFERENCE YOU NEED TO CALL THE ESTIMATOR BEFORE YOU DIG !!!
___________________________________________________________________________________________________________________________________